M Centra Data Centre is designed for resilience and robustness to ensure your critical IT systems will continue to run even during prolonged nationwide blackouts.
This is achieved through:
Carefully selected standby power generators, UPS’s and active harmonic filters for optimum performance.
Dedicated and fire segregated electrical plant rooms for Transformers (max of two in one enclosure) MSB’s, UPS’s and UPS Batteries.
Six Substations, including one redundant substation, two emergency plants on 4 + 1 configuration, 24 UPS Systems on N + N configuration with 'A' Plan and a 'B' Plan distribution system.
One hundred percent redundant power distribution network for mechanical chillers as well as CRAC/PCU’s with Automatic Transfer Switches to minimise interruptions.
Power distribution system with “Total Co-ordination” (i.e. Overload and fault discrimination).
High “Availability” power provision with best of breed redundancies.
High “Reliability” power system with minimal power distribution equipment.
Underground tanks housing hundred of thousands of litres of backup fuel
State of the art high efficiency Uninterruptible Power Supply Systems, Low Carbon emission.
Green Data Centre with minimal energy wastage.
Tier 3 plus Classification electrical installation to TIA 942 “Telecommunications Infrastructure Standard for Data Centre”.
Minimisation of circuit breakers in line for high reliability.
Modular design and installation to isolate cross interference and any adverse effect between various zones and floors of the Data Centre.
Power monitoring system to manage the facility to its optimum efficiency, reliability and availability.
Current harmonic mitigation to improve the distribution system efficiency.
EMI Mitigation to minimise equipment down time caused by power system electro magnetic radiation.